  • Provision of Customs Clearance, Heavy Transportation & Heavy Lifting Equipment for Aban Singapore Pte Ltd to support offshore Jackup Drilling Rig DD5 from Oct 2017 – Sept 2020.
  • Supply of equipment & manpower Lifting, Transportation Equipment Rental and Associated Services to Amaniaga Resources Sdn Bhd for Onshore Support Services for Brunei Methanol Company’s SEAFLEX Floating Hose Rectification Works Project (A1506027/MTD) from Aug – Oct 2017.
  • Supply of equipment & manpower Lifting, Transportation Equipment Rental and Associated Services to PTSC Mechanical & Construction Pte Ltd for fabrication of jacket at Muara for TOTAL’s Maharalela South (MLS) Project from May 2014 to July 2015.
  • Provision of one unit Drilling Support Vessel (DSV) – MP Lagenda for TOTAL E&P Borneo B.V to support Drilling Campaign for Maharalela South (MLS) Project under Contract No. 2346000616 from 15/01/16 – 14/05/17.
  • Provision of equipment package but not limited to heavy lift cranes, trucks/trailers and manpower for the Rig Move operations, waste management, custom clearance and forwarding including immigration works sub-contracted to Seria Drilling Company Sdn Bhd (KCA Deutag) from 2000 up to May 2015 (T-201 drilling land rig) and from January 2016 onwards (T-203 drilling land rig) till April 2019.
  • Supply of equipment & manpower Lifting, Transportation Equipment Rental and Associated Services to Stanford Orion Services Sdn Bhd for Onshore Support Services for Brunei Methanol Company’s SEAFLEX Floating Hose MEF Underwater Remedial Work Jun – Jul 2013. This included Importation arrangement & transportation of BMC used Hose from Labuan to Brunei.
  • Provision of equipment package but not limited to heavy lift cranes, trucks/trailers and manpower for the N503 Heavy Land Rig Move operations, waste management, custom clearance and forwarding for Nabors-Amrtur Drilling International from June 2007 to Feb 2009.
  • Provision of facilities and services, crane and transportation, manpower for Aban Singapore Pte Ltd (Brunei)) under the contract with Brunei Shell Petroleum for offshore drilling rig – DD8 from January, 2011 up to December, 2015.
  • Lifting 75 Tons PLEM unit onto barge at Muara Port with Kobelco 250 Tons crawler crane with simultaneous trailer movement (13th Nov 2009).
  • Provision of Kobelco 250 Tons crawler crane for BLNG’s OCP New HRSG F-1511 Elbow Ducting replacement project from 24-09-2011 till 7-10-2011.
  • Lifting of 41 Tons Riser from trailer to vessel at Muara Port in 7th November 2012 for ENSCO Oceanics International Co.
  • Provision of facilities and services, crane and transportation, manpower for Sapura Energy (previously Sapura Kencana Drilling/Seadrill/Smedvig Sdn Bhd) under the contract with Brunei Shell Petroleum for offshore drilling rig – West Menang and West Pelaut since 1991 up to present.
  • Provision of facilities and services, crane and transportation, manpower for Seadrill Brunei Ltd) under the contract with Brunei Shell Petroleum for offshore drilling rig – West Castor from November 2013 up to May 2016.
  • Provision of facilities & services, crane for heavy lifts, transportation and manpower for Dowell Schlumberger Eastern Inc. contract with Brunei Shell Petroleum for the provision of C.T.U. & stimulation services from Aug 2005 up to present.
  • Project management with BDP International for storage & transportation of hydrogen tube tanks for Brunei Methanol Company shutdown in 2009.
  • Contractor for Powerflexo Resources Sdn Bhd for storage & transportation of hydrogen tube tanks for Brunei Methanol Company shutdown in May, 2015.
  • Contractor for Brunei Shell Petroleum for the supply of 87 units of Toyota Hilux Pick Ups (Jan 2009 – Feb 2015).
  • Contractor for Mitsubishi Heavy Industries & P.T. Rekayasa Industries for the Brunei Methanol Project for custom clearance, forwarding, inland transportation & Heavy Lifting including beach jetty roll-on/roll-off operation at SPARK for oversized cargoes on multi-axles Cometto trailer, heavy lifts & logistics arrangements with Schenker-Seino (Apr 2008 – Dec 2009) & Tiong Woon (Singapore) Corporation Bhd.
  • Barging & arrangement of multi-axles Cometto trailer from Kuala Belait private Jetty to BMC, SPARK for 1 unit E-1402 Reformer on 10th Aug 2008.
  • Transporting Containerised Equipment Room from AWE’s Fabrication Yard in Bassalton to MCY Yard in Nov 2007.
  • Provision of heavy lifting and haulage for various components of BLNG Power Station Project in December, 2006 from MCY Jetty to BLNG Plant.

  • Transporting from Muara Port to SAV Anduki Airport & heavy lifting for offloading of 2 units Agusta Helicopters for BSP-SAV on 18th Aug 2013 (Sunday).

  • Provision of cranes for the dismantling of discontinued theme park rides at Jerudong Park Playground in 2006.

  • Spot-hire contract to B.S.P Co Sdn Bhd for the supply of heavy-lift cranes, trailers and forklift truck at BSP STL Base at Kuala Belait, Seria & Muara.

  • Supply all lifting heavy equipment at Total Elf Petroleum Logistic Base for offshore drilling operation since 1988 till present.

  • Provision of equipment package for Oil Drilling & Exploration (B) Pty Ltd’s Rig Move operations in 1996-1997.

  • Provision of heavy equipment & transportation on site for Jurong Engineering Limited S’pore at Gadong Power Station, Bandar Seri Begawan from 1995 – 1996.

  • Provision of cranes, trailers & trucks for the delivery of materials, installation of theme park facilities at Jerudong Park Playground in 1996.

  • Provision of equipment/transport for pipe haulage (gas coated pipe line) for McConnel Dowell (Aust) Pty. Ltd who contracted with Brunei Government for pipes laying & installation of gas line to Jerudong Gas Turbine Plant in July to Oct 1994.

  • Supply complete equipment package for Voest Alpine M. C. E Gmbh for loading/offloading and transportation of long columns and oversize cargoes for the Reformer Projects, Seria in 1991.

  • Supply complete equipment package for Brunei Government Electrical Services for loading/offloading and transportation materials and transformers within Brunei Darussalam.

  • Supply complete equipment package (3 months) for Far East Levingston Shipbuilding Ltd to service their jacking systems machinery at Santa Fe Base, Kuala Belait in 1990.

  • Sub-contracted by Yong Nam Engineering to supply cranes and transport equipment with 150 tons crawler crane (heavy lift operation) for the new Brunei Airport Hanger Project in Gadong, Brunei Darussalam from May to Dec 1995.

  • Co-ordination & handling of cargoes for SDV South East Asia Pte. Ltd. Contract of Maharajalela/Jamalulalam Project at BLNG, Brunei.

  • Provision of packing services and house moving with Brunei Shell Petroleum Sdn. Bhd. since 1999 up to 30th Sept 2005.

  • Provision of equipment and services but not limited to crane and transportation of drilling equipment and components to KB/Muara Shell Base for offshore operations, load testing and certification of equipment for Transocean Sedco Forex in the year 1989 – 2000.

  • Assisted Bawden Drilling (M) Sdn Bhd to mobilize/demobilize drilling equipment package to Rasau Location for emergency blow-out in October 1989.